beautypg.com

ShoreLand'r PT2147TB User Manual

Page 7

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003938

Page 7

03/31/2008

SPRINGS

See Diagram D.

Position the axle under the frame so it is properly orientated. All

2” x 2” pontoon axles have holes drilled for mounting brake lines.

These attaching holes must be positioned to the rear of the trailer.

(If a brake axle is being installed, make sure axle is oriented so the

brake backup plates are on the right sides of the trailer. (Right on

right and left of left.)

Place the springs under the axle as shown so the closed eye of the

spring is to the front of the trailer. Drop two ½´x 2 9/16´x 5” square

U-bolts down around the axle and on each side of the spring as

shown.

Align the legs of the U-bolt with the holes in a spring pad and then

insert so the spring pad is up against the spring. Secure with ½”

flange lock nuts. Tighten to keep all items in position but do not se-

curely tighten until the axle assembly is completely installed under

the frame.

AXLE

Place one of the spring bracket bushings into the rear of the spring

bracket and secure with a 9/16” x 3 1/4” hex bolt and hex lock nut.

Repeat in other spring bracket. Position the axle under the frame,

then hook the loop end of the spring around the bushings just in-

stalled. Note that if the axle is positioned too low when trying to

hook, the loops will not hook around the bushings.

Raise the front of the springs up so they align with the front hole

of the spring bracket. Secure in place with 9/16” X 3-1/4” hex bolts

and lock nuts. Repeat this process on the other spring.

Tighten all axle U-bolts and spring bolts not tightened at this time.

CONNECTING THE TONGUE & SIDE FRAME BRAKE LINES

Locate the brass brake line coupling. Remove the plastic caps from

the ends of both the tongue and side frame brake hoses and thread

them into the coupling. Tighten. Push the remaining brake hose

either back into the tongue or the side frame. Re-install the rubber

grommet into the side frame if removed during connection of the

brake hoses.

ONE AXLE BRAKE INSTALLATION

Note that the right brake caliper has a brass block attached to it that

has two ports. Remove the bottom plug on the right caliper and the

single plug on the left caliper. Locate the 98” brake hose supplied in

the kit. Attach the brake hose to the brass blocks on both the right

and left caliper where the plugs were just removed. Tighten. Locate

four of the round brake hose clips and place them around the brake

hose spacing them so they are in alignment with the four pilot holes

drilled into the top of the axle. Attach the round brake hose clips to

the axle by threading the self-tapping screws provided into the pre-

drilled pilot holes. Tighten.

Remove the remaining brass plug from the brass block located on

the right caliper. Pull the frame brake line hose out of the side frame

enough so it can be routed down through the large hole in the brake

hose clip welded to the spring bracket and then down to the brass

block where the plug was just removed.

Thread the end of the brake hose into the port from where the plug

was removed earlier and tighten according to the tightening instruc-

tions. Pull the excess hose back up through the hole in the brake

hose clip leaving only enough slack in the hose to allow for the

full movement of the axle when towing. Place a rubber grommet

around the brake hose and insert it into the hole in the brake hose

clip.

Push all excess hose back into the side frame. Secure the brake

hose to the inside of the side frame using either one or two of the

round brake hose clips and self-tapping screws provided. Space

the hose clips so they are evenly spaced from the side frame hole

to where the hose is positioned in the brake hose clip.

Fill the actuator reservoir with brake fluid and bleed the brake sys-

tem per the bleeding instructions in one of the following: UFP Brake

Bleeding Manual or the ShoreLand’r Disc Brake Manual. Once

bled, refill the reservoir and replace the reservoir cap.

NOTE: The axle has brake fluid installed in the clusters and the

axle line when it is assembled at the factory. This is done to protect

the inner parts of the brake system during shipping and storage.

The complete brake system including the axle

MUST be re-bled to

ensure that all air has been removed from the brake system.

TIRE AND WHEEL ASSEMBLIES

Mount the tire and wheel assemblies using the ½” fine threaded

tapered lug nuts provided. Tighten to 85-95 ft/lb. of torque using the

rotation pattern as shown in the ShoreLandr’s Owners Manual.

Re-torque the lug nuts after 50 miles of driving and then periodi-

cally thereafter.