ShoreLand'r PT2030TB User Manual
Tire size & carrying capacity chart, Tongue weight adjustment, Bundles required final assembly instructions

PT2030T B & PT2030T BB
Parts Manual
PT2030T B Pontoon 20 Tandem Trailer - 3000 lbs.
4 4300181 20.5 X 8 X 10-D Tire/MSilver Rim (or)
4 4300203 20.5 X 8 X 10-D Tire/Galv Rim
1 65762
Brake Kit - W/UFP Actuator - 1st Axle
1 60106--
Pontoon Axle Assy W/Brakes
1 62340
Literature Bag - Trailers
1 64692--
Frame Bundle - PT2030T B
Tire Size & Carrying
Capacity Chart
Tire
Load
Carrying
Size Range
Capacity
20.5 X 8 X 10
D
1330
lb. per/tire
Refer to tire side wall for proper tire pressure.
Tongue Weight Adjustment
Approximate Tongue Weight for Best Towing.
Tongue weight too high, move the axle assembly forward.
Tongue weight too low, move the axle assembly backward.
Tongue weight should be 5% to 7% of the total gross
weight of the boat and trailer combined.
Bundles Required
Final Assembly Instructions
Remove the small parts from the frame by cutting the
bands. Remove the bolt bag and sort all the nuts and bolts
by size.
Springs:
Mount the springs under the axle with the 1/2 X 5 axle u-
bolts from the top down. Install the spring plate under the
axle. Tighten with 1/2 flange lock nuts evenly.
Fenders:
Install the fenders and spring bracket assembly to the side
frame using 1/2 u-bolts (Ref.#12) in the area that would
best provide the proper tongue weight.
Axle:
Place one of the spring bushings (Ref.#61) into the rear of
the spring bracket and secure with a 9/16 X 3-1/4 hex
bolt and 9/16 hex lock nut. Repeat on the other side.
Position the axle under the frame, then hook the spring
loop around the bushing just installed. Raise the axle
assembly up so the front of the springs line up with the
front spring bracket hole. Insert the other two (2) 9/16 X
3-1/4 hex bolts and 9/16 hex lock nuts. Tighten all nuts
and bolts but do not over tighten. Allow the spring room
enough to move.
Mount the tire and rim assemblies using 80-90 ft. lbs. of
torque on the lug nuts using a proper tightening procedure.
Tongue:
Install the 9 tongue wire and grommet in the tongue.
Install the tongue into the nose cone of the trailer frame.
Secure the tongue plate cover (Ref.#4) and the rear of the
tongue with a 1/2 X 1-1/2 hex bolt, 1/2 flat washer and
1/2 hex lock nut. Secure the tongue into the side of the
frame tongue cap using a 1/2 X 4 hex bolt and 1/2 flange
lock nut. Tighten both bolts. Install the coupler on the
tongue and secure with one (1) 1/2 X 4 and two (2) 1/2 X
1 hex bolts. Tighten using 1/2 flange lock nuts. Do not
overtighten.
Actuator & Safety Chain:
Slide the actuator (Ref.#97) into the actuator housing unit
(Ref.#99) and secure with two (2) pins and snap rings
provided with the actuator. Secure the actuator - housing
unit to the front of the tongue using three (3) ½ X 4 hex
bolts and ½ flange lock nuts. Using a ½ X 5 hex bolt in
the lower right mounting hole on tongue, secure the safety
chain. Place a ½ flat washer on ½ X 5 hex bolt followed
by one safety chain and insert into actuator and tongue.
Place the second safety chain on the bolt followed by a ½
flat washer and ½ flange lock nut. Tighten.
®
PT2030T BB Pontoon 20 Tandem Trailer - 3000 lbs.
4 4300181 20.5 X 8 X 10-D Tire/MSilver Rim (or)
4 4300203 20.5 X 8 X 10-D Tire/Galv Rim
1 65762
Brake Kit - W/UFP Actuator - 1st Axle
1 60111
Brake Kit - 2nd Axle
2 60106--
Pontoon Axle Assy W/Brakes
1 62340
Literature Bag - Trailers
1 64693--
Frame Bundle - PT2030T BB