ShoreLand'r PT1818 User Manual
Tire size & carrying capacity chart, Tongue weight adjustment, Bundles required

PT1818, PT1818G, BKPT1818, PT1818 B & PT1818G B
Parts Manual
PT1818 Pontoon Trailer 1800 lbs. - White
2 4300181 20.5 X 8 X 10-D Tire/MSilver Rim
1 61395
Coupler Bag W/Chains
1 62340
Literature Bag - Trailers
1 6463001 Frame Bundle - PT1818 White
Tire Size & Carrying
Capacity Chart
Tire
Load
Carrying
Size Range
Capacity
20.5 X 8 X 10
D
1330 lb. per/tire
Refer to tire side wall for proper tire pressure.
Tongue Weight Adjustment
Approximate Tongue Weight for Best Towing.
Tongue weight too high, move the axle assembly forward.
Tongue weight too low, move the axle assembly backward.
Tongue weight should be 5% to 7% of the total gross
weight of the boat and trailer combined.
Bundles Required
PT1818G Pontoon Trailer 1800 lbs. - Galvanized
2 4300203 20.5 X 8 X 10-D Tire/Galv. Rim
1 61395
Coupler Bag W/Chains
1 62340
Literature Bag - Trailers
1 6463000 Frame Bundle - PT1818 Galvanized
BKPT1818 Pontoon Trailer 1800 lbs. - Black
2 4300181 20.5 X 8 X 10-D Tire/MSilver Rim
1 61395
Coupler Bag W/Chains
1 62340
Literature Bag - Trailers
1 6463003 Frame Bundle - PT1818 Black
PT1818 B Pontoon Trailer 1800 lbs. - White W/Brakes
2 4300181 20.5 X 8 X 10-D Tire/MSilver Rim
1 6010602 Pontoon Axle Assembly W/Brakes
1 62340
Literature Bag - Trailers
1 6468601 Frame Bundle - PT1818 Brakes - White
1 65762
Brake Kit W/UFP Actuator - 1st Axle
PT1818G B Pontoon Trailer 1800 lbs. - Galv. W/Brakes
2 4300203 20.5 X 8 X 10-D Tire/Galv. Rim
1 6010600 Pontoon Axle Assembly W/Brakes
1 62340
Literature Bag - Trailers
1 6468600 Frame Bundle - PT1818 Brakes - Galv.
1 65762
Brake Kit W/UFP Actuator - 1st Axle
Final Assembly Instructions
Remove the small parts from the frame by cutting the
bands. Remove the bolt bag and sort all the nuts and bolts
by size.
Springs:
Mount the springs under the axle with the 1/2 X 5 axle u-
bolts from the top down. Install the spring plate under the
axle. Tighten with 1/2 flange lock nuts evenly.
Fenders:
Install the fenders and spring bracket assembly to the side
frame using 1/2 u-bolts (Ref.#12) in the area that would
best provide the proper tongue weight.
Axle:
Place one of the spring bushings (Ref.#66) into the rear of
the spring bracket and secure with a 9/16 X 3-1/4 hex
bolt and 9/16 hex lock nut. Repeat on the other side.
Position the axle under the frame, then hook the spring
loop around the bushing just installed. Raise the axle
assembly up so the front of the springs line up with the
front spring bracket hole. Insert the other two (2) 9/16 X
3-1/4 hex bolts and 9/16 hex lock nuts. Tighten all nuts
and bolts but do not over tighten. Allow the spring room
enough to move.
Mount the tire and rim assemblies using 80-90 ft. lbs. of
torque on the lug nuts using a proper tightening procedure.
®