beautypg.com

Special instructions – ShoreLand'r PS8X17TB User Manual

Page 11

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0004005

Page 11

Rev D 08/08/2011

Align the holes provided in the edge of the ramp with the holes

in the center of the ramp retainer attachment channels as

follows:

Place one of the ¼” pins with the wire retainer through the

aligned holes in the ramp and the retainer attachment channel.

Align the hole in the second ramp retainer attachment channel

with the second hole in the ramp. Note that the U-bolt may

have to be loosened so the ramp retainer attaching channel

can be moved either direction to align the holes. When aligned,

insert a second ¼” pin with wire retainer. Once the pin is in-

serted, retighten the U-bolt just loosened to adjust for proper

hole spacing. The two pins will secure the ramps in the trans-

port position.

Note the (right) passenger side ramp must always be installed

first.

Repeat the above process on the second ramp on the (left)

drivers side of the trailer.

There are two carriage bolts and plastic bushing supplied in

the kit. These bushing, when mounted on the ramp, will keep

the ramps from moving either inward or outward when load-

ing your machine. The bushings will extend down between the

deck planks to eliminate the side movement during loading.

Mount the bushing to the end of the ramp that attaches to the

trailer side frame. The bushing can be installed in one of three

positions to create the appropriate spacing width for loading

your machines.

Installation is complete. The ramps can now be stored secure-

ly during the towing process and can be easily removed for

either loading or unloading the machines.

Using The Ramps

• Always remove the ramp that is on the

*left side of the

trailer first. The ramps are removed from its normal trans-

port position by removing the two ¼” retainer pins that attach

the ramp to the ramp retainer attachment channels.

• Once the pins are removed, rotate the ramp backward on top

to remove it from the ramp retainer attachment channels.

• Place the hook end of the ramp over the side frame tube or

the rear tube of the trailer deck so the hook end catches over

the inside top of the tube. This will secure it in place while load-

ing the machine.

• Repeat the above process on the second ramp. Space the

ramps to mate the wheel centers of the machine.

• Once the machines are loaded and the ramps are ready for

storage, place them in the ramp retainer attachment channels

using a reverse process of removing them.

Special Instructions:

Always check lighting and turn signal operations before towing.

Secure or tie-down your load before towing.

To prevent damage to your ATV trailer, tighten all fasteners before

towing.

Your ATV trailer is equipped with a totally grounded wire

harness. You must be sure the wire harness plug that comes from

the tow vehicle is grounded to the tow vehicle using the white

grounding wire.

Check all lug nuts for proper torque before towing.

Contact your authorized

ShoreLand’r dealer if you experi-

ence a problem with your trailer. To locate a dealer, please use

www.shorelandr.com - the dealer locator feature.

For more information or assistance, contact

ShoreLand’r at 1-800-

859-3028 or visit

www. shorelandr.com.

This manual is related to the following products: