0004002

Page 4

10/01/2008

ing 1/2” lug nuts. Note the taper end of the nut must be towards the

rim. Hand tighten the lug nuts using the star pattern as described

in the owners guide. Use a torque wrench for the final tightening of

the lug nuts. Torque to 85-95 ft. lbs. of torque. Recheck the torque

after 50 miles of use, then periodically thereafter.

Front Ramp Kit

The front ramp kit is designed to attach to the front cross frame tube

of the PS5x10, PS5x14, and the PS8x17 series. The kit includes

the ramps and all attaching hardware for converting the ramps into

a front shield while being stored for transport. The ramp retainer

channels are designed to accommodate U-bolts for attaching them

to either a 2x3” or 2x4” frame tube.

Installing the ramps in the following manner will allow for the re-

moval of the ramp from the *left side of the trailer first.

*Left and Right side of trailer is indicated by standing at the

rear of the trailer.

Installation Instructions

Locate the four ramp retainer attachment channels. Note that

they are all identical.

The two ramp retainer attachment channels on the *right side

of the trailer will be installed on the front side of the trailer front

frame tube so it will support the ramp as shown.

Note that the kit is supplied with two different size U-bolts. Se-

lect the proper size to fit your frame tube. Place one of the

correct size square U-bolt around the front frame tube so the

legs of the U-bolt are pointing forward. Align the holes in one of

the ramp retainer attachment channels with the U-bolt legs, then

slide into position. Note that this channel is mounted on the

front side of the frame tube. Secure in place with 3/8” lock

washers and 3/8” hex nuts.

Position the U-bolt so it is 24” from the outside of the side

frame tube.

Repeat the mounting process on the second channel. Position

this ramp retainer attachment channel so that the center hole

in the ramp retainer bracket is 27” from the center hole in the

ramp retainer channel just installed. Tighten enough to hold in

position until the ramp is installed for final spacing.

Install the remaining two ramp retainer attachment channels

on the left side of the trailer to the rear side of the front frame

tube using the steps above. Placing them on the rear of the

frame tube allows the ramps to overlap past each other in the

middle.

Once all four of the ramp retainer attachment channels are at-

tached to the frame, position the right ramp into the ramp re-

tainer attachment channels. The ramp can either be slid into

the end of the channels or else placed in the approximate posi-

tion, then rotated into place.

Align the holes provided in the edge of the ramp with the holes

in the center of the ramp retainer attachment channels as

follows:

Place one of the ¼” pins with the wire retainer through the

aligned holes in the ramp and the retainer attachment chan-

nel.

Align the hole in the second ramp retainer attachment channel

with the second hole in the ramp. Note that the U-bolt may

have to be loosened so the ramp retainer attaching channel

can be moved either direction to align the holes. When aligned,

insert a second ¼” pin with wire retainer. Once the pin is in-

serted, retighten the U-bolt just loosened to adjust for proper

hole spacing. The two pins will secure the ramps in the trans-

port position.

Note the (right) passenger side ramp must always be installed

first.

Repeat the above process on the second ramp on the (left)

drivers side of the trailer.

There are two carriage bolts and plastic bushing supplied in

the kit. These bushing, when mounted on the ramp, will keep

the ramps from moving either inward or outward when load-

ing your machine. The bushings will extend down between the

deck planks to eliminate the side movement during loading.

Mount the bushing to the end of the ramp that attaches to the

trailer side frame. The bushing can be installed in one of three

positions to create the appropriate spacing width for loading

your machines.

Installation is complete. The ramps can now be stored secure-

ly during the towing process and can be easily removed for

either loading or unloading the machines.

Using The Ramps

• Always remove the ramp that is on the *left side of the

trailer first. The ramps are removed from its normal trans-

port position by removing the two ¼” retainer pins that attach

the ramp to the ramp retainer attachment channels.

• Once the pins are removed, rotate the ramp backward on top

to remove it from the ramp retainer attachment channels.

• Place the hook end of the ramp over the side frame tube or

the rear tube of the trailer deck so the hook end catches over

the inside top of the tube. This will secure it in place while load-

ing the machine.

• Repeat the above process on the second ramp. Space the

ramps to mate the wheel centers of the machine.

• Once the machines are loaded and the ramps are ready for

storage, place them in the ramp retainer attachment channels

using a reverse process of removing them.

This manual is related to the following products: