beautypg.com

ShoreLand'r PWC2213W V.2 User Manual

Page 7

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003599

Page 7

REV B 09/11/07

FINAL ASSEMBLY INSTRUCTIONS

Remove all banded items from the frame and sort hardware

by size.

SPRINGS

Position the axle so it is properly aligned with the trailer. Place

the springs on the top side of the spring pads welded to the

axle. (See chassis diagram). Note that the hook end of the

spring must be mounted to the rear of the trailer. Place a

spring clamp on the top center of the spring as shown. Next

place the 1/2” x 6-1/2” U-bolts down over the top of the spring

clamp, spring and axle as shown.

Place the spring and axle U-bolt plate onto the ends of the

two U-bolts just placed. Secure in place with 1/2” lock nuts.

Thread onto the U-bolts but do not tighten securely until the

complete unit is in position on the trailer. Repeat on the other

spring.

AXLE

Place one of the spring bracket bushings into the rear of the

spring bracket and secure with a 9/16” x 3 1/4” hex bolt and

hex lock nut. Repeat in other spring bracket.

Position the axle under the frame, then hook the hook loop

of the spring around the bushings just installed. Note that if

the axle is positioned too low when trying to hook, the hooks

will not hook around the bushings.

Raise the front of the springs up so they align with the front

hole of the spring bracket. Secure in place with 9/16” x 3-1/4”

hex bolts and lock nuts.

Tighten all axle U-bolts and spring bolts not tightened at this

time.

TIRE & WHEEL ASSEMBLY

Mount the tire and wheel assemblies using the 1/2” fine

threaded tapered lug nuts provided. Tighten to 85-95 ft./lb.

of torque using the rotation pattern as shown in the Shore-

Landr’s Owners Manual.

Re-torque the lug nuts after 50 miles of driving and then

periodically thereafter.

WINCH POSTS

The winch posts can be mounted as far forward on the mount-

ing channels as possible until the PWC’s are placed on the

trailer. Attach by placing the 3/8” bolts through the holes in the

bottom of the winch posts and the mounting channels.

Place the winch handles onto the winch drive shafts and se-

cure using the 1/2 “ nuts provided. All other adjustments will

be done after the PWC’s are positioned on the trailer.

OPTIONAL JACK & MOUNTING HARDWARE (Page 5)

1. Place wave spring washer on mounting bracket hard-

ware.

2. Place mounting bracket and spring washer on outside of

jack mount.

3. Position the formed outer washer inside the jack mount

and the formed inner washer on the outside of the mount-

ing bracket hardware. Secure with a coarse ½” hex bolt

threaded from the outside to a ½” hex lock nut outside of

the outer formed washer.

4. Insert the top two (2) 3/8” x 4” hex bolts into the mounting

bracket hardware continuing through the mounting straps.

Using the 3/8” lock washers and 3/8” hex nuts, secure the

mounting straps on the hex bolts by only a few threads.

5. Place the jack and mounting hardware on the tongue. Se-

cure by inserting the remaining two (2) 3/8” x 4” hex bolts

through the bottom part of the mounting bracket hardware

and mounting straps. Secure with remaining hex nuts and

lock washers.

6. Check for clearance for handle swing, trailer light cables

and coupler clearance. Tighten.

WALK BOARD:

Locate the front walk board mounting bracket. (Item #1,

Page 5) Place it on the front of the frame and align the

holes in the bracket with the holes provided in the frame.

Mount the front walk board bracket to the front of the frame

by placing two (2) 3/8” x 5” carriage bolts in the holes

provided from the top side down through the frame. Secure

with 3/8” lock washers and hex nuts.

Mount one of the back walk board plates to the

middle cross member by placing 3/8” x 3-1/2” car-

riage bolts from the top side down through the walk-

board plate (Item #2, Page 5) and crossmember.

Secure with a 3/8” lock washer and hex nut. Tighten. Repeat

this process on the rear crossmember.

Place the walk board down the centerline of the trailer on top

of the walk board mounting brackets just installed. Center

on the brackets side ways and lengthwise. Attach the walk

board to the brackets by placing No. 14 x 1-1/2” self tapping

screws in the holes provided in the mounting brackets from

the bottom side up into the carpeted walk board. Thread in

the screws until tight.

BUNKS: FRONT CROSSMEMBER

Outside PWC bunk brackets on each side of the trailer:

Slide a 3/8” x 3-7/16” x 3” square U-bolt (Item #10, Page 3)

over the front cross member so the threaded end of the U-bolt

is pointing forward. Position the PWC bunk bracket on the

front side of the cross member so that the dog leg end of the

bracket is pointing outward. Align two holes in the PWC bunk

bracket with the legs of the U-bolt, then insert U-bolt through

the holes in the PWC bunk bracket and secure with 3/8” lock

washers and hex nuts. Repeat this process on the other

outside PWC bunk bracket on the front cross member.

Inside PWC bunk brackets on each side of the trailer:

Repeat the above process except point the dog-leg of the

PWC bunk brackets toward the center of the trailer.

This manual is related to the following products: