beautypg.com

ShoreLand'r TA0141 User Manual

Page 3

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003892

Page 3

REV B 02/28/08

Removal of Existing Front Stop

Remove the front stop weldment from the front of the utility trailer.

Loosen and remove the 3/8” X 3” U-bolts, 3/8” lock washers, 3/8”

flat washers and 3/8” hex nuts.

Do Not Discard!

NOTE: The existing front stop weldment can be used as a side

stop/rail option.

Installation Instructions

• Locate the four ramp retainer attachment channels. Note that

they are all identical.

• The two ramp retainer attachment channels on the *right side

of the trailer will be installed on the front side of the trailer front

frame tube so it will support the ramp as shown in the dia-

grams A and B.

• Note that the kit is supplied with two different size U-bolts. Se-

lect the proper size to fit your frame tube. Place one of the

correct size square U-bolt around the front frame tube so the

legs of the U-bolt are pointing forward. Align the holes in one of

the ramp retainer attachment channels with the U-bolt legs, then

slide into position. Note that this channel is mounted on the

front side of the frame tube. Secure in place with 3/8” lock

washers and 3/8” hex nuts.

• Position the U-bolt so it is 10 ½” from the outside of the side

frame tube as shown on the 2ATV and 3ATV trailers in Dia-

gram A. Position them so they are as shown in Diagram B for

the PS5x10, PS5x14, and PS4x12 trailers.

• Repeat the mounting process on the second channel. Position

this ramp retainer attachment channel so that the center hole

in the ramp retainer bracket is 27” from the center hole in the

ramp retainer channel just installed. Tighten enough to hold in

position until the ramp is installed for final spacing.

• Install the remaining two ramp retainer attachment channels

on the left side of the trailer to the rear side of the front frame

tube as shown in Diagrams A and B using the steps above.

Placing them on the rear of the frame tube allows the ramps to

overlap past each other in the middle.

• Once all four of the ramp retainer attachment channels are at-

tached to the frame, position the right ramp into the ramp re-

tainer attachment channels. The ramp can either be slid into

the end of the channels or else placed in the approximate posi-

tion, then rotated into place.

• See Diagram A. Align the holes provided in the edge of the

ramp with the holes in the center of the ramp retainer attach-

ment channels as follows: Place one of the ¼” pins with the

wire retainer through the aligned holes in the ramp and the

retainer attachment channel positioned 10 ½” from the side of

the frame and secure.

• Align the hole in the second ramp retainer attachment channel

with the second hole in the ramp. Note that the U-bolt may

have to be loosened so the ramp retainer attaching channel

can be moved either direction to align the holes. When aligned,

insert a second ¼” pin with wire retainer. Once the pin is in-

serted, retighten the U-bolt just loosened to adjust for proper

hole spacing. The two pins will secure the ramps in the trans-

port position.

• Note the passenger side ramp must always be installed

first.

• Repeat the above process on the second ramp on the drivers

side of the trailer.

• Installation is complete. The ramps can now be stored secure-

ly during the towing process and can be easily removed for

either loading or unloading the machines.

Using The Ramps

• Always remove the ramp that is on the *left side of the

trailer first. The ramps are removed from its normal trans-

port position by removing the two ¼” retainer pins that attach

the ramp to the ramp retainer attachment channels.

• Once the pins are removed, rotate the ramp backward on top

to remove it from the ramp retainer attachment channels.

• Place the hook end of the ramp over the side frame tube or

the rear tube of the trailer deck so the hook end catches over

the inside top of the tube. This will secure it in place while load-

ing the machine.

• Repeat the above process on the second ramp. Space the

ramps to mate the wheel centers of the machine.

• Once the machines are loaded and the ramps are ready for

storage, place them in the ramp retainer attachment channels

using a reverse process of removing them.

NOTE: The TA0141 replaces the TA0091. Please contact

customer service if more information is required.

*Left and Right side of trailer is indicated by standing at the

rear of the trailer.