beautypg.com

ShoreLand'r SLRB46TBL V.2 User Manual

Page 3

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003565

Page 3

FINAL ASSEMBLY INSTRUCTIONS

Remove the hardware bag from the frame, remove parts and sort

by size.

RB SERIES

The RB bunk system comes pre-assembled from the factory. Break

the bundle and center one of the RB bunk systems on the rear

pivot cross member of the frame. Locate two ½” x 3 9/16” x 3 7/8”

U-bolts. Slide a U-bolt up around the rear pivot cross member, align

the legs of the U-bolt with the holes in the mounting plate of the RB

bunk support tube. Insert the U-bolt through the holes and secure

with ½” flange lock nuts. Repeat on the second U-bolt. Tighten the

lock nuts only enough to hold in position. They will have to be re-

adjusted when the boat is placed on the trailer.

The short stabilizer bunk is installed to the adjustable bunk bracket

on the front cross member with a 3/8” x 1” hex bolt and lock nut.

(See Diagram A, Detail B.)

Repeat the above process on the bunk on the other side of the

trailer.