ShoreLand'r SLRB46TBL V.2 User Manual
Page 3

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003565
Page 3
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove parts and sort
by size.
RB SERIES
The RB bunk system comes pre-assembled from the factory. Break
the bundle and center one of the RB bunk systems on the rear
pivot cross member of the frame. Locate two ½” x 3 9/16” x 3 7/8”
U-bolts. Slide a U-bolt up around the rear pivot cross member, align
the legs of the U-bolt with the holes in the mounting plate of the RB
bunk support tube. Insert the U-bolt through the holes and secure
with ½” flange lock nuts. Repeat on the second U-bolt. Tighten the
lock nuts only enough to hold in position. They will have to be re-
adjusted when the boat is placed on the trailer.
The short stabilizer bunk is installed to the adjustable bunk bracket
on the front cross member with a 3/8” x 1” hex bolt and lock nut.
(See Diagram A, Detail B.)
Repeat the above process on the bunk on the other side of the
trailer.