beautypg.com

ShoreLand'r SLRB40TBLW V.1 User Manual

Page 3

background image

Midwest Industries, Inc.

Ida Grove, IA 51445

800.859.3028

www.shorelandr.com

0003451

Page 3

FINAL ASSEMBLY INSTRUCTIONS

Remove the hardware bag from the frame, remove

parts and sort by size.

RB SERIES

The RB-series rear bunk assembly is installed by plac-

ing the bunk assembly mounting channel over the rear

cross member and securing in place with a 1/2” x 4-

1/4” hex bolt and lock nut. (See Diagram A). Tighten

only enough to hold in position until the boat is placed

on the trailer. Repeat on the other RB-bunk assem-

bly.

The short stabilizer bunk is installed to the adjustable

bunk bracket on the front cross member with a 3/8” x

1” hex bolt and lock nut. (See Diagram A, Detail B).