ShoreLand'r SLR46TBBL V.1 User Manual
Page 3

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003560
Page 3
FINAL ASSEMBLY INSTRUCTIONS
Remove the hardware bag from the frame, remove
parts and sort by size.
R SERIES
The R-series roller rack is installed by placing the roller arm
assembly mounting channel over the rear cross member and
securing in place with a 1/2” x 4-1/2” hex bolt and lock nut. (See
Diagram A). Note that it should be left loose until the boat is
placed on the trailer. Once the proper positions is determined, it
may be tightened. Repeat on the other roller arm
assembly.
The short stabilizer bunk is installed to the adjustable bunk
bracket on the front cross member with a 3/8” x 1” hex bolt
and lock nut. (See Diagram A, Detail C).
This manual is related to the following products: