SPRINGS

Position the axle so it is properly aligned

with the trailer. Place the springs on the

top side of the spring pads welded to the

axle. (See chassis diagram). Note that the

hook end of the spring must be mounted

to the rear of the trailer. Place a spring

clamp on the top center of the spring

as shown. Next place the 1/2” x 6-1/2”

U-bolts down over the top of the spring

clamp, spring and axle as shown.

Place the spring and axle U-bolt plate

onto the ends of the two U-bolts just

placed. Secure in place with 1/2” lock

nuts. Thread onto the U-bolts but do not

tighten securely until the complete unit is

in position on the trailer. Repeat on the

other spring.

AXLE

Place one of the spring bracket bushings

into the rear of the spring bracket and

secure with a 9/16” x 3 1/4” hex bolt

and hex lock nut.

Repeat in other spring bracket.

Position the axle under the frame, then

hook the hook loop of the spring around the

bushings just installed. Note that if

the axle is positioned too low when

trying to hook, the hooks will not

hook around the bushings.

Raise the front of the springs up so they align

with the front hole of the spring bracket.

Secure in place with 9/16” x 3-

1/4” hex bolts and lock nuts.

Tighten all axle U-bolts and spring bolts

not tightened at this time.

TIRE & WHEEL ASSEMBLY

Mount the tire and wheel assemblies

using the 1/2” fine threaded tapered lug

nuts provided. Tighten to 80-90 ft./lb. of

torque using the rotation pattern as shown

in the ShoreLandr’s Owners Manual.

Re-torque the lug nuts after 50 miles of

driving and then periodically thereafter.

Recommended carrying capacity is based on

shipping weight of the trailer with standard

equipment. Adding optional equipment may

decrease the trailer’s carrying capacity.