ShoreLand'r LEB40TCBBLW V.1 User Manual
Page 11

Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorelandr.com
0003287
REV B 2/08/06
Page 11
Trailer Adjustments
The adjustment of the trailer to your boat is very important not only
for the trailer, but also the boat. Failure to do so may lead to poten-
tial failure or damage to either the trailer or boat.
Adjust as follows:
AXLE ADJUSTMENT
The amount of tongue weight on your trailer can be adjusted as
follows:
To lower the tongue weight, adjust the axle assembly forward. To
increase the tongue weight, adjust the axle backward.
The distance that the axle assembly has to be moved will vary be-
cause it is directly related to the weight and center of gravity of the
boat placed on it.
Best towing is achieved when the tongue weight is 5-7% of the total
gross load of the complete unit.
Note: Wire harnesses and brake lines (if equipped with brakes) will
need care when moving the axle assembly.
REAR SUPPORT SYSTEM
Place the boat on the trailer so that the transom is located at the
rear of the support system. On a bunk trailer, the transom of the
boat should be within 1-2” of the end of the bunk.
BUNKS
Make sure the bunks are positioned far enough apart to give your
boat as much stability as possible while transporting. Position the
bunks so they are located just to the outside of a strake or else
have the strake located between the long and short bunk on each
side. Note that the spacing between the long and short bunk can be
changed by mounting the bunks in a different hole in the mounting
bracket of the equilload arm that it attaches to. This will help center
your boat and assist when loading. The bunks need to be adjusted
up high enough to keep the keel from resting on the center pads. A
minimum of one to two inches of clearance is desirable.
FRONT SUPPORT SYSTEM
BUNK
The front of the bunks should be adjusted either in or out so that
the bunk will continue to run just to the outside of the strake of the
boat. Adjust the bunks up so that there is approximately 1-2 inches
clearance between the keel of the boat and the center cross mem-
ber pad.
WINCH POST
Now that all other adjustments are complete the winch post can
be adjusted. Slide the winch post base backward on the tongue
until the bow roller comes in contact with the boat. This bow roller
needs to be positioned directly above the boat bow eye to prevent
your boat from moving forward in the event of a sudden stop. It
can be moved up or down by removing the back bolt that mounts
the winch head to the base. When this bolt is removed, the head
can be rotated up or down to reach the desired height required to
fit your boat. Once in this position, align the closest pair of holes in
the brackets and reinsert the bolt just removed. Tighten. Attach the
winch strap and crank winch tight. Attach the bow eye safety chain
into the bow eye of the boat as well. This is just another level of
protection to keep your boat and trailer together as one unit.
INSTALLING THE REAR STEPS
Once all other adjustments are made the front portions of the steps
can now be installed. Note that there is a right and left step. (See
Items 13 and 14 in Diagram D located on page 8.) Identify the
proper steps for each side. The front of each step has two 5/16”
slotted holes provided for attaching it to the rear mounting bracket
of the fender.
Position the step in its approximate location front to rear. With the
top surface of the step you are installing positioned at approximate-
ly a 45 degree angle upward to the step welded to the frame, place
the step up against the bottom outside edge of the step portion
welded to the trailer frame. Once aligned in this position, rotate the
step downward into its proper position. As it is rotated into position
it will align itself up with the welded on portion of the step. When
in position the step can now be moved forward so that the 5/16”
slotted holes in the step align with the holes provided in the fender
mounting bracket. Secure the step to the fender mounting bracket
using 1/4” x 3/4” carriage bolts and 1/4” hex lock nuts provided.
Tighten. Repeat this process on the other step.
Locate the 4 (Part # 0810974) self-drilling screws provided in the
box with the running board steps. Slide the back of the step up
against the rear step welded to the frame. Place two screws in the
pilot holes provided in the rear of the step. Drill through the rear
step to secure steps todether. Repeat on the other step.
Locate the adhesive-back non-skid surface material provided. Po-
sition it so that it is equally spaced from both the front and rear as
well as from side to side of the step just installed. Once the proper
positioning is determined, remove the adhesive backing from the
non-skid and replace into position. Apply equal pressure to all areas
of the non-skid to make sure that it is securely bonded to the step.
Repeat this process on the other step. Assembly is complete.
Adjustments are now complete. Double check your boat for fit. If
desired fit has been achieved, tighten all fasteners that may have
either been left loose or have been loosened to do the adjusting.
Note: All nuts and bolts must be tightened before towing.
The law requires that the white ground wire on both the tongue wire
harness and vehicle harness be properly grounded to respective
trailer and vehicle frames.
Re-check all fasteners on the complete trailer to make sure they
are all tight and ready for towing. All fasteners should be periodi-
cally check before towing.
See your ShoreLand’r Owner’s Guide for further technical infor-
mation regarding your trailer and its components.