beautypg.com

Enerco MHVFB10LPI User Manual

Page 7

background image

Installation instructions and Owner’s Manual

7

1. Locate two horizontal slots on back pane of

heater (see figure 19).

2. Place heater onto mounting bracket. Slide

horizontal slots onto stand-out tabs on mounting

bracket.

Figure 9

Installing Bottom Mounting Screws

1. Locate two bottom mounting screw holes. These

holes are near bottom on back panel of heater

(see figure 9).

2. Mark screws locations on wall.
3. Remove heater from mounting bracket.
4. If installing bottom mounting screw into hollow or

solid wall, install wall anchors. Follow steps 1

through 4 under Attaching to Wall using Anchor.

If installing bottom mounting screw into wall

stud, drill holes at marked locations using 9/64”

drill bit.

5. Re-place heater onto mounting bracket.
6. Place spacers between bottom mounting holes

and wall anchor or drilled hole.

7. Hold spacer in place with one hand. With the

other hand, insert mounting screw through

bottom mounting hole and spacer. Place tip of

screw in opening of wall anchor or drilled hole.

8. Tighten both screws until heater is firmly se-

cured to wall. Do not over tighten.

Note: Do not re-place front panel at this time. Re-

place front panel after making gas connections and

checking for leaks.

CONNECTING TO GAS SUPPLY FOR

PERMANENT INSTALLATION

WARNING: A qualified service person must connect

heater to gas supply. Follow all local codes.

WARNING: This appliance requires a 3/8” NPT

(National Pipe Thread) inlet connection to the

pressure regulator.

CAUTION: Never connect heater directly to the Propane

supply. This heater requires an external regulator (not

supplied). Install the external regulator between the heater

and Propane/LP supply.

The installer must supply an external regulator. The

external regulator will reduce the incoming gas pressure

to between 11 and 14 inches of water. If you do not

reduce incoming gas pressure heater regulator damage

could occur. Install external regulator with the vent

pointing down as shown in Figure 12. Pointing the vent

down protects it from freezing rain or sleet.

CAUTION: Use only new black iron or steel pipe.

Internally-tinned copper tubing may be used in certain

areas. Check your local codes. Use a large enough

diameter pipe to allow proper gas volume to heater. If

pipe is too small, undue loss of pressure will occur.

Installation must include an equipment shutoff valve,

union and plugged 1/8” NPT tap. Locate NPT tap within

reach of test gauge hookup. NPT tap must be upstream

from heater (see figure 12).

Figure 12

*A CSA/AGA certified equipment shutoff valve with 1/8”

NPT tap is an acceptable alternative to test gauge

connection. Purchase the CSA/AGA certified equipment

shutoff valve from your dealer.

IMPORTANT: Install an equipment shutoff valve in an

accessible location. The equipment shutoff valve is for

turning on or shutting off the gas to the appliance.
Apply pipe joint sealant lightly to male threads. This will

prevent excess sealant from going into pipe. Excess

sealant in pipe could result in clogged heater fuel train.

CAUTION: Use pipe joint sealant that is resistant to

LP-Gas.

Install sediment trap in supply line as shown in figure 12.

Locate sediment trap where it is within reach for clean-

ing. A sediment trap traps moisture and contaminants.

This keeps them from going into heater. If sediment trap

is not installed or is installed improperly, heater may not

Horizontal Slots

Mounting Bracket

mounted to wall

Pressure

Regulator

Heater

Cabinet

Ground Joint

Union

Equipment

Shutoff Valve

From regulated LP tank

(11”W.C. to 14”W.C.

pressure).

)

Tee Joint

1/8” NPT Plug Tap

Cap

Pipe Nipple

Tee Joint

3/8” NPT Pipe Nipple

Sediment

Trap

Test Gauge

Connection

Reducer Bushing

to 1/8” NPT

3” Minimum

Mounting Screws