beautypg.com

Installing a mezzanine board upgrade – Grass Valley K2 Media Client Field Kit Upgrade Instruction Manual Sep.24 2007 User Manual

Page 5

background image

August 3, 2007

K2 Media Client Field Kit Upgrade Instructions

5

Installing a mezzanine board upgrade

6. Identify the position of a mezzanine board currently installed, as illustrated.

Each position could have either a decoder mezzanine board or an encoder
mezzanine board, according to the current channel configuration, as follows:

If the system has the following channels…

Mezzanine boards are positioned as follows:

Record Channels

Play Channels

Position P3/R2

Position P4/R1

0

2

Empty

Empty

0

3

Decoder

Empty

0

4

Decoder

Decoder

1

2

Empty

Encoder

1

3

Decoder

Encoder

2

2

Encoder

Encoder

Flip the codec board
over so the mezzanine
board is on top.

1

Identify mezzanine
board positions

P3/R2 position

P4/R1 position

2

BNC connectors