beautypg.com

Aqua Lung Apeks Regulator User Manual

Page 30

background image

US

30

valve and tighten the handwheel by hand until it is lightly snug.

DO NOT use tools to tighten.

3. If a submersible pressure gauge is attached to the first stage,

ensure that the gauge is facing away from you. Pressurise

the regulator by slowly opening the cylinder valve handwheel.

Continue to turn the cylinder valve handwheel until fully open, and

then back

1/2

turn.

4. Listen near the first stage to check for any leakage. If leakage is

detected, immerse the first stage while pressurised to determine

the source.

5. If leakage has been detected, follow the procedure for removing

the regulator from the cylinder valve on page 24. If air was leaking

between the first stage and cylinder valve, replace or re-seat the

cylinder valve O-ring as needed and repeat the above procedure.

If leakage persists, return the cylinder and regulator to an

authorised dealer.

DIN to Yoke Converter

For regulators which may be used back and forth between Yoke and

DIN connections, Apeks offers a convenient DIN to Yoke converter.

First, obtain factory prescribed installation of the DIN connector

through an authorised dealer. Then, simply attach the converter to

connect your regulator to a yoke valve.

WARNING: Adaptors from yoke 1st stage to a DIN cylinder

valve must never be used. This would allow a greater working

pressure to be used than the yoke connector is designed to

take.

Regulator Owner’s Manual

............................................................................................