Chapter 5: maintenance, 1 preventative maintenance schedule – AEC Colortronic MSH Series 2039 User Manual
Page 21

C Series Granulators
Maintenance
21 of 53
Chapter 5: Maintenance
5-1 Preventative Maintenance Schedule
Check
Frequency
Check tightness of cutting chamber hold-down fasteners
(Refer to Section 3-6 on page 16)
Daily
Check the tightness of screen cradle retainer knobs
(Refer to Section 5-4 on page 23)
Daily
Check infeed flap position/condition (replace if necessary)
Daily
Check position and condition of interlock actuator screws
(Refer to Section 3-6 on page 16 and Section 5-4 on page 23)
Daily
Do housekeeping around work area
Daily
Check tightness of upper chamber pivot arm screws
(520 NM, 366 ft. lbs.)
Weekly
Check jackscrew travel adjustment: internal limit switches and chamber
mounting bracket limit switch
(Refer to Sections 5-5 and 5-6 on pages 25 - 28.)
Weekly
Check that pivot pins and locknuts for jackscrews are tight
(Refer to Sections 5-5 and 5-6 on pages 25 - 28.)
Weekly
Inspect overall condition of jackscrews
(Refer to Sections 5-5 and 5-6 on pages 25 - 28.)
Weekly
Check zero speed sensor operation
(Refer to Section 5-6 on page 26)
Weekly
Check knife clearance and wear.
(Refer to Section 5-8 on page 32)
Weekly
Check that rotor and bed knife bolts have proper torque
(640 NM, 472 ft. lbs.)
Weekly
Check lubrication. More frequent lubrication may be required
(Refer to Section 5-2 on page 22)
Monthly
Check belt tension (Refer to Section 5-10 on page 35)
Monthly
Turn screens front to back (Refer to Section 5-4 on page 23)
Monthly