3.3 Pre-Operational Checklist

After all electrical and mechanical machine elements have been inspected and any defects
corrected, the machine can be put into production once the pre-operational checklist is
referred to.

Have all installation and preparation instructions been read and followed?

Have sufficient location clearances been allowed?

Has the equipment been grounded as required by local codes and/or Article 250 of the

National Electric Code?

Have all motors been checked for rotation?

Have all machine controls, pushbuttons, and limit switch safeties been checked for

proper

functioning?

Have the cutting and screen chambers been checked for foreign matter?

Have the drive belts been checked for alignment and tension?

Is the machine properly closed with all visible fasteners tight?

Are all accessory components electrically and mechanically connected with proper

support and with all fasteners tight?

Are cyclonic air separator and filter bags empty? (optional equipment)

Has the fan (optional) been verified for proper rotation direction?

Are all electrical enclosure boxes tightly closed and clamped shut?

Are all personnel clear of the machine?