TK SERIES

AEC, INC.

INSTALLATION INSTRUCTIONS

STEP 1. LOCATION OF THE SYSTEM

¾

Place the

TK SERIES

Cooling Tower Water Treatment System on a firm level surface

adjacent to (within15 feet of) the cooling tower reservoir. The

TK SERIES

system does

not need to be anchored, unless required by local code or if the reaction column stand
is separate from the filtration skid. Select a location close to the cooling tower for
convenience, accessibility and serviceability. If the filter is to operate year-round,
exposure to winter conditions should be considered

Open all crates and check for the following components.

1. Reaction column(s)

a. 8, ¾ x 4 bolts /column
b. 8, ¾ x 5 bolts /column
c. 16, ¾ nuts /column
d. 32, ¾ flat washers /column
e. 16, ¾ lock washers/column
f. 1, 1 ½ dia. screen /column
g. 1, tee strainer clear bowl/column
h. 1, 53 lb can of AEC media/column
i. 1, 8” blind flange with 2” female npt thread/column
j. 1, 8” flange gasket/column

2. TK SERIES filter assembly

a. 1, strainer housing
b. 1, strainer basket
c. 1, clear strainer lid
d. 1, 6” O-ring
e. 1, mounting gasket
f. 1, Tensioning clamp
g. 1, high flow air/pressure relief valve
h. 1, ¾ id drain hose with mounting Clips
i. 4, pump strainer mounting bolts
j. Sand 150 lbs Tk20, 250lbs TK40, 400 lbs TK60 and TK80