beautypg.com

Point-to-point application – Westermo LRW-102 User Manual

Page 22

background image

22

6650-2260

Point-to-point application

Configure the network

Check that it is running correctly with the electrical serial network.

Prepare the fibre optical network

Connect the fibre links between the units.

Connect the power supply to all units.

The Fibre links should be in operation, indicated by active CH 1 LED's.

Connect the LON equipment to the LRW-102PP.

The point-to-point application is up and running.

TX RX

TX

RX

CH 1

CH 1

LON

Network

LON

Network

This manual is related to the following products: