6 COMMISSIONING

6.1 Preparations

• Connect the electric motor in conformance with the locally applicable rules and

regulations. Have the electrical installation work be carried out by qualified personnel.

• The pump casing is filled to half way level with a specially compounded hose

lubricant. If necessary refill Bredel lubricant via the breather/vent plug (also see:
“Maintenance”: “Changing lubricant”, § 7.3).

• Check the rotation of the rotor.
• Check that the correct number of shims (series SP/25 to SP/100) corresponds with

your application, see “Specifications”: “Shimming”, § 10.1.7.

• For adjusting the compression force of the hose, see “Maintenance”: “Hose

compression force adjustment (shimming)”, § 7.8.

6.2 Commissioning

• Connect the pipework. Make sure that there are no obstructions such as closed

valves.

• Switch on the hose pump.
• Check the rotation of the rotor.
• Check the capacity of the hose pump. If the capacity differs from your specification,

follow the instructions in chapter 9 “Troubleshooting” or consult your Bredel
representative.

• Check the hose pump in accordance with points 1 to 4 of the maintenance table from

section “Maintenance and periodic inspections”, § 7.1.