Installation guide, Installation procedures – Upsite 10113 Pass Through Blanking Panel – 2U User Manual
Page 2
2
Designer & Manufacturer
(888) 982-7800 www.upsite.com
Installation Guide
HotLok Pass Through Blanking Panel
Tools Required for Installation
Tools Required:
• Phillips head screw driver or drill and bit
Installation Procedures
Installation of HotLok Pass Through Blanking Panel
1. Attach two cage nuts at the desired position on the server rack where the
pass through blanking panel will be mounted.
2. Test fit the blanking panel to the cage nuts to ensure proper alignment.
Place a screw through each opening on the blanking panel.
3. Using a screw driver begin to attach the blanking panel to the server rack.
Do not over-torque the screws.
4. Once the blanking panel is mounted, cables may be pulled through the
brushes.
Removing the HotLok Pass Through Blanking Panel
If for any reason the HotLok Pass Through Blanking Panel needs to be removed,
this can be done by removing both screws, followed by the blanking panel and
then removing the cage nuts. Cables do not need to be removed.
Dimensions
Inches
Millimeters
Part No. 10112 - 1U - Overall size (length x height)
19” x 1.75”
482.5 x 44.45mm
Part No. 10113 - 2U - Overall size (length x height
19” x 3.5”
482.5 x 89mm
Usable Area
Part No. 10112 - 1U
11.5 sq. inches
|
282 sq. mm
Part No. 10113 - 2U 42.75 sq. inches
|
1085 sq. mm