Installation guide – Upsite 40002 Round 4 Rack Mount Grommet User Manual
Page 4

4
Designer & Manufacturer
(888) 982-7800 www.upsite.com
Installation Guide
HotLok Round 4” Rack Mount Grommet
General Information
Effective Installation of Cables
In order to minimize any air loss from the rack hole selection, make sure to allow
for adequate slack in the cables. If the cables are under too much tension, the
grommet may be pulled apart, resulting in a gap that will cause an increase in
the flow of air escaping through the rack.
Maintaining Proper Cooling of Equipment
Failure to follow computer manufacturer’s guidelines for maintaining proper
cooling may result in the overheating of equipment. Before sealing cable cutouts,
ensure that there is adequate air flow to the intake sides of computer equipment
or cabinets through devices such as perforated floor tiles or grates. Achieving
proper airflow to the intake side of the computer equipment and/or cabinets is
the responsibility of the customer.
Safety Requirements
Installers must be familiar with standard safety and risk management practices
when working on or in environments for rack equipment.
Customer Support
If you have any questions, please
contact us direct at (505) 798-0200,
or Toll Free at (888) 982-7800
Email us at [email protected]
U.S. Patent no.6,632,999 and International
Patents Pending | P/N 60051 Rev. A © 2012
Printed on
Recyclable Paper