Installation guide – Upsite 10144 Full Rack Blanking Panel Kit – 36U User Manual
Page 6

6
Installation Guide
HotLok
®
Full Rack Blanking Panel Kit
General Information
The maintenance of the manufactures guidelines for proper cooling may result in the overheating of equipment.
Before minimizing rack airflow, ensure proper airflow to the intake side of your computer equipment or cabinets is
feasible through the use of devices such as perforated floor tiles. Achieving proper airflow to the intake side of the
computer equipment and/or cabinets is the responsibility of the customer.
Safety Requirements
Installers of our HotLok® Full Rack Blanking Panel Kit must be familiar with standard safety and risk management prac-
tices when working in raised floor environments and when modifying racks and cabinets.
Please take precautions from the wiring inside the rack system and make sure not to move during installation process.
HotLok® Full Rack Blanking Panel Kit is not 100% sealed due to the customization for your system.
Customer Support
If you have any questions, please contact us at: 505-798-0200, M-F, 7AM-4PM MST
or email us at:
Upsite Technologies, Inc.
Fax (505) 798-0236 Tel (505) 798-0200
www.upsite.com
P/N 60242 Rev. A © 2012