beautypg.com

Ecm-os, Installation procedures, Wiring details – Thermon ECM-OS User Manual

Page 3: The heat tracing specialists

background image

3

ECM-OS

INSTALLATION PROCEDURES

The Heat Tracing Specialists

®

6.

Terminate cable with appropriate PETK

termination kit. Refer to PETK installation

instructions. Push excess cable back

through gland. Tighten cap securely. Tape

cable expansion loop to pipe.

3.

Position RTD Sensor(s) in grommet. Do

not pull from the sensor end when routing

through the RTD gland. Pull sensor from

the lead wire portion.

5.

Insert cable into gland. Make

sure bus connection (HPT and FP

only) remains outside of expediter.

4.

Locate bus connection (HPT and FP only)

as shown. Cut end of cable at angle to

aid in piercing grommet. Leave additional

cable for expansion as needed.

2.

Mounting: Secure wall mount to

mounting surface using screws

(provided by others).

1.

Slide appropriate IEK insulation entry

kit components onto cable.

RTD

Lead Wire

RTD

Sensor

Power Cable

8.

Install power cable. Complete system

wiring. Terminal set screws shall be

tightened to a torque value of 1,4

Nm (12,4 lb-in). See wiring details.

Set modules electronic control and/or

control limiter at desired setpoints.

7.

Install M25 power gland (order separately)

and M25 blind plug.

45

°

min.

300 mm

(12")

Wiring Details

L

L

N

N

C NO

NC

Comm. Port

Alarm Relay

Main supply

Heater output

B

B

A

A

B

B

RTD

Limiter Sensor

RTD
Controller Sensor

GND

1

2

9.

Wiring Details:

Connect ground wire from power cable,

braid from heater, and connections from

the module to the grounding strip.