beautypg.com

Terminator, Zp-r-wp, Installation procedures – Thermon ZP-R-WP User Manual

Page 4

background image

9.

Remove M25 dust cap. Install M25

power gland (order separately)

a n d M 2 5 b l i n d p l u g . F o r

in-line splice, T-splice, or end termination,

install additional M25 blind plug (order

M25-B-EXE separately) instead of M25

power gland.

10.

Install power cable.

Terminator

TM

ZP-R-WP

INSTALLATION PROCEDURES

Specifications and information are subject to change without notice. Form PN50863U-0114

THERMON . . . The Heat Tracing Specialists

®

www.thermon.com

Corporate Headquarters

100 Thermon Dr.

PO Box 609

San Marcos, TX 78667-0609

USA

Phone: +1 512-396-5801

European Headquarters

Boezemweg 25

PO Box 205

2640 AE Pijnacker

The Netherlands

Phone: +31 (0) 15-36 15 370

For the Thermon office nearest you

visit us at . . .

www.thermon.com

12.

Install junction box lid and twist hand

tight. Insert screwdriver into ratchet slots

located on side of junction box base.

Use screwdriver to ratchet on junction

box lid. Lid will rotate 30 degrees. To

remove lid, repeat this step in the opposite

direction.

13.

Install IEK insulation entry kit to seal

heating cable penetration through

insulation cladding.

11.

Install terminal block and complete

system wiring. Terminal set screws shall

be tightened to a torque value of 1.4 Nm

(12.4 lb-in). See below for wiring details.

Power Supply

N

L1

PE

Wiring Details: Single Phase Circuit

Heat Tracing

Power Supply

L2

L1

PE

Wiring Details: Phase - Phase Circuit

Heat Tracing

Power Supply

L3

L2

L1

PE

Heat Tracing

Wiring Details: 3-Phase Circuit (Power Side)

Wiring Details: 3-Phase Circuit (End or "Star" Side)

Note: Install separately supplied bridge on

terminal L1, L2 and L3.

#1

#2

#3

Heat Tracing

#1

#2

#3