beautypg.com

Terminator, Zp-r-wp, Installation procedures – Thermon ZP-R-WP User Manual

Page 2

background image

2

Tools Required . . .

1

2

4

3

5

Dimensions . . .

10

8

Item Quantity

Description

1

1

Expediter Assembly

Support Cap with O-Ring

Threaded Grommet Compressor

Grommet

Support Base with O-Ring

2

1

Junction Box Lid

3

1

Junction Box Base with O-Ring & M25 Dust Cap

4

1

Nut

5

1

Banding

6

1

Terminal Block and Bridge (separately)

7

1

Junction Box Cord

8

1

Blind Plug

9

1

Bracket

10

3

Screws

11

3

Washers

3 mm

8 mm

28 mm

33 mm

Warnings . . .
• Due to the risk of electrical shock, arcing and fire

caused by product damage or improper usage,

installation or maintenance, a ground-fault protection

device is required.

• Installation must comply with Thermon requirements

(including form PN 50207U for Ex systems) and be

installed in accordance with the regulations as per the

norm EN IEC 60079-14 for hazardous areas (where

applicable), or any other applicable national and local

codes.

• Component approvals and performance ratings are

based on the use of Thermon specified parts only.

• De-energize all power sources before opening

enclosure.

• Avoid electrostatic charge. Clean only with a damp

cloth.

• Keep ends of heating cable and kit components dry

before and during installation.

• Minimum bending radius of heating cable is five (5)

times the cable outer diameter.

• Individuals installing these products are responsible

for complying with all applicable safety and health

guidelines. Proper Personal Protective Equipment

(PPE) should be utilized during installation. Contact

Thermon if you have any additional questions.

Order Separately . . .
IEK Insulation Entry Kit (per cable)
IEK-TES-1 OR 2

for TESH and TES(X)L

7

Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-5

for direct connection

PETK-10 & 11

for cold lead connection

6

11

9

Terminator

TM

ZP-R-WP

INSTALLATION PROCEDURES

The following installation procedures are suggested guidelines

for the installation of the Terminator ZP-R-WP Kit. For

translations other than English and local language translation

provided here, please contact Thermon. The English

language installation procedure shall govern.

Kit Contents . . .

Receiving, Storing and Handling . . .

1. Inspect materials for damage incurred during

shipping.

2. Report damages to the carrier for settlement.

3. Identify parts against the packing list to ensure the

proper type and quantity has been received.

4. Store in dry location.

Terminator-LN-Tool

(order separately)

190mm

50mm

155mm

200mm

205mm

Certifications/Approvals . . .

1725 II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM10ATEX0058X

IP66

-60°C ≤Ta≤+55°C

Ordinary & Hazardous Locations