Terminator, Installation procedures – Thermon ZL Terminator User Manual
Page 3
3
1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to
aid in piercing grommet. Leave additional
cable for expansion loop. See page 4 for
multiple cable installation tips.
4.
Insert banding guide into expediter and snap
into place..
2.
Insert cable into expediter. If mounted on bot-
tom or side of pipe, punch out weep hole.
3.
Slide expediter toward pipe and route cable
through support base entry.
7.
Terminate cable with appropriate PETK termi-
nation kit. Refer to PETK installation instruc-
tions.
8.
Push excess cable back through expediter.
Tighten cap securely. Tape cable expansion
loop to pipe.
9.
Mount junction box base on expediter. Make
sure to align slots to properly orient junction
box base. Tighten nut with Terminator-LN-
Tool. If mounting horizontally, threaded gland
holes must face downward.
5.
Mount expediter to pipe using pipe band. Do
not band over cable.
6.
Cut off end of cable. .
Terminator
TM
ZL
INSTALLATION PROCEDURES