Terminator, Zs/ze, Installation procedures – Thermon ZS Terminator User Manual
Page 3

3
1.
Locate bus connection (HPT and FP only) and 
cable as shown. Cut end of cable at angle to 
aid in piercing grommet. Leave additional 
cable for expansion loop. See page 4 for 
multiple cable installation tips.
4.
Insert banding guide into expediter and snap 
into place..
2.
Insert cable into expediter. If mounted on 
bottom or side of pipe, punch out weep hole.
Note: For HPT and FP cable, exchange 
grommet in Terminator with GRW-G provided 
in PETK-3.
3.
Slide expediter toward pipe and route cable 
through support base entry.
7.
Terminate cable with appropriate PETK 
termination kit. Refer to PETK installation 
instructions.
8.
Push excess cable back through expediter. 
Tighten cap securely. Tape cable expansion 
loop to pipe.
9.
Connect bus wires using small crimps and 
connect ground wires using large crimp. See 
page 9 for wiring details. Trim excess wire if 
necessary.
5.
Mount expediter to pipe using pipe band. Do 
not band over cable.
6.
Cut off end of cable. .
Terminator
TM
ZS/ZE
INSTALLATION PROCEDURES
