Terminator, Zs/ze, Installation procedures – Thermon ZS Terminator User Manual
Page 2: Db c a

2
Tools Required . . .
Terminator-LN-Tool
(order separately)
3 mm
8 mm
28 mm
29 mm
33 mm
Item
Quantity
Description
1
1
Expediter Assembly
Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Splice Cap
3
1
Banding Guide
4
1
Banding
Terminator
TM
ZS/ZE
INSTALLATION PROCEDURES
Kit Contents . . .
1
2
4
3
2
4
3
5
Order Separately for End Termination
PETK Power and End Termination Kits (per cable)
PETK-1
for BSX, RSX, VSX
PETK-2
for KSX, HTSX,
PETK-3
for FP, HPT
Item
Quantity
Description
1
1
RTV Tube
2
1
Power Connection Boot
3
1
End Cap
4
1
Tape Strip Tefl on 6" (PETK-3 only)
5
1
End Termination Caution Label
6
1
GRW-G Grommet (PETK-3 only)
1
2
4
3
5
Order Separately for Inline Splice
SCTK Splice Connection Termination Kits (per cable)
SCTK-1
for BSX, RSX, VSX
SCTK-2
for KSX, HTSX,
SCTK-3
for FP, HPT
Item
Quantity
Description
1
3
Splice Connection Boots
2
2
Small Crimps
3
1
Large Crimp
4
2
Small Crimp Insulators
5
2
Silicone Caps
6
3
Ground Sleeves
7
1
RTV Tube
6
1
Certifi cations/Approvals . . .
1725 II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM 10ATEX0058X
IP66 -60°C Ta +55°C
Ordinary & Hazardous Locations
FMG 10.0022X Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C
Warnings . . .
• Due to the risk of electrical shock, arcing and fi re caused
by product damage or improper usage, installation or
maintenance, a ground-fault protection device is required.
• Installation must comply with Thermon requirements and be
installed in accordance with the regulations as per the norm
EN IEC 60079-14 for hazardous areas (where applicable), or
any other applicable national and local codes.
• Component approvals and performance ratings are based
on the use of Thermon specifi ed parts only.
• De-energize all power sources before opening enclosure.
• Avoid electrostatic charge. Clean only with a damp cloth.
• Keep ends of heating cable and kit components dry before
and during installation.
• Minimum bending radius of heating cable is 32 mm (except
HPT is 57 mm and FP is 19 mm).
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper Personal Protective Equipment (PPE) should be
utilized during installation. Contact Thermon if you have any
additional questions.
7
6
Dimensions . . .
A
inch (mm)
B
inch (mm)
C
inch (mm)
D
inch (mm)
Terminator
ZS/ZE
3” (75mm)
3” (75mm)
3-1/2”
(90mm)
7-3/4”
(200mm)
D
B
C
A
Terminator has additional hazardous area approvals including:
• GGTN • Kazakhstan