Terminator, Zp-xp, Installation procedures – Thermon ZP-XP Terminator User Manual
Page 4
4
Terminator
TM
ZP-XP
INSTALLATION PROCEDURES
11.
Remove M25 dust cap. Install M25 power
gland (order separately) and M25 blind
plug. For in-line splice, T-splice, or end
termination, install additional M25 blind
plug (order M25-B-EXE separately)
instead of M25 power gland.
12.
Install power cable (if necessary).
13.
Install terminal block and complete
system wiring. Terminal set screws shall
be tightened to a torque value of 1.4 Nm
(12.4 lb-in). See below for wiring details.
14.
Install junction box lid and twist hand
tight. Insert screwdriver into ratchet slots
located on side of junction box base.
15.
Use screwdriver to ratchet on junction
box lid. Lid will rotate 30 degrees.
16.
Lid latch mechanism fully engaged. To
remove lid, repeat steps 14 and 15 but
in the opposite direction.
10.
Mount junction box base on expediter.
Make sure to align slots to properly
orient junction box base. Tighten nut
with Terminator-LN-Tool. If mounting
horizontally, threaded gland holes must
face downward.