Terminator, Zp-xp, Installation procedures – Thermon ZP-XP Terminator User Manual
Page 2

2
Tools Required . . .
Terminator-LN-Tool
(order separately)
3 mm
8 mm
28 mm
29 mm
33 mm
Certifications/Approvals . . .
1725 II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C FM 10ATEX0058X
IP66 -60°C ≤ Ta ≤ +55°C
Ordinary & Hazardous Locations
FMG 10.0022X Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C
Item
Quantity
Description
1
1
Expediter Assembly
Support Cap with O-Ring
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Junction Box Lid
3
1
Junction Box Base with O-Ring
and M25 Dust Cap
4
1
Nut
5
1
Banding
6
1
Banding Guide
7
1
Terminal Blocks with DIN Rail
(Refer to terminal specifications for
maximum allowable wire size)
8
1
Junction Box Cord
9
1
Blind Plug
1
2
6
4
3
8
5
7
9
Dimensions . . .
Terminator
TM
ZP-XP
INSTALLATION PROCEDURES
Kit Contents . . .
The following installation procedures are suggested
guidelines for the installation of the Terminator ZP-XP Kit.
For translations other than English and local language
translation provided here, please contact Thermon. The
English language installation procedure shall govern.
Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-1
for RSX, VSX, BSX
PETK-2
for KSX, HTSX
PETK-3
for HPT, FP
The Heat Tracing Specialists
®
Warnings . . .
• Due to the risk of electrical shock, arcing and fire
caused by product damage or improper usage,
installation or maintenance, a ground-fault protection
device is required.
• Installation must comply with Thermon requirements
(including form PN 50207U for Ex systems) and be
installed in accordance with the regulations as per the
norm EN IEC 60079-14 for hazardous areas (where
applicable), or any other applicable national and local
codes.
• Component approvals and performance ratings are
based on the use of Thermon specified parts only.
• De-energize all power sources before opening
enclosure.
• Avoid electrostatic charge. Clean only with a damp
cloth.
• Keep ends of heating cable and kit components dry
before and during installation.
• Minimum bending radius of heating cable is 32 mm
(except HPT is 57 mm and FP is 19 mm).
• Individuals installing these products are responsible
for complying with all applicable safety and health
guidelines. Proper Personal Protective Equipment
(PPE) should be utilized during installation. Contact
Thermon if you have any additional questions.
Thermon has additional hazardous area approvals
including:
• GGTN • Kazakhstan