beautypg.com

Terminator, Ze-b beacon, Installation procedures – Thermon ZE-B Beacon Terminator User Manual

Page 3

background image

1.

Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to
aid in piercing grommet. Leave additional cable
for expansion loop.

3.

Slide expediter toward pipe and route cable
through support base entry.

4.

Insert banding guide into expediter and snap
into place.

5.

Mount expediter to pipe using pipe band. Do
not band over cable.

2.

Insert cable into expediter. If mounted on
bottom of pipe, punch out weep hole.

6.

Cut off end of cable.

7.

Terminate cable with appropriate SCTK
termination kit. Refer to SCTK installation
instructions. Push excess cable back through
expediter. Remove braid pigtail. Tape cable
expansion loop to pipe.

50mm

(2")

Max.

300mm

(12")

Bus

Connection

Weep Hole

101mm

(4") Min.

Do Not Band

Over Cable

25mm

(1") Min.

Expediter

Assembly

Boot

Wire Crimp

Heating Cable

Light Module

Light Module

Wiring

Wiring Details for LED Light

LED Light Pigtail

Heating Cable

8.

Connect heating cable to light module wires
using small crimps. Discard large crimp. See
wiring details.

Expediter

Terminator

TM

ZE-B Beacon

INSTALLATION PROCEDURES