Terminator, Ze-b beacon, Installation procedures – Thermon ZE-B Beacon Terminator User Manual
Page 2
Kit Contents . . .
Tools Required . . .
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper
type and quantity has been received.
4. Store in a dry location.
Dimensions . . .
Terminator
TM
ZE-B Beacon
INSTALLATION PROCEDURES
Item
Quantity
Description
1
1
Expediter Assembly
Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Light Module Cover
3
1
Banding Guide
4
1
Banding
5
1
LED Light Module
1
2
4
3
Order Separately . . .
SCTK Connection Termination Kits (per cable)
SCTK-1
for BSX, RSX, VSX
SCTK-2
for KSX, HTSX
SCTK-3
for FP, HPT
5
210mm
(8.28")
75mm
(3.0")
89mm
(3.5")
66mm
(2.6")
Item
Quantity
Description
1
3
Splice Connection Boots
2
2
Small Crimps
3
1
Large Crimp
4
2
Small Crimp Insulators
5
2
Silicone Caps
6
3
Ground Sleeves (not used with ZE-B Kits)
7
1
RTV Tube
8
1
GRW-G (FP and HPT only)
2
4
3
5
6
1
7
Note:
Crimp Tool - Ideal 30-429 or factory approved alternate.
IP66 -60°C ≤ Ta ≤ +45°C
Ordinary & Hazardous Locations
IECEx FMG 10.0022X Ex eb mb IIC T6, Ex tb IIIC T85°C
1725 II 2 GD Ex eb mb IIC T6, Ex tb IIIC T85°C, FM 10ATEX0058X
Certifi cations/Approvals . . .
8
Installation Precautions . . .
• To minimize the potential for arcing and fi re caused by product
damage or improper installation use ground-fault protec-
tion.
• Installation must comply with Thermon requirements and be
installed in accordance with the applicable national and local
codes.
• Component approvals and performance ratings are based on
the use of Thermon specifi ed parts only.
• De-energize all power sources before opening enclosure.
• Avoid electrostatic charge. Clean only with a damp cloth.
• Keep ends of heating cable and kit components dry before
and during installation.
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper personal protective equipment, or PPE, should be
utilized during installation. Contact Thermon if you have
any additional questions.