beautypg.com

Terminator, Ze-b beacon, Installation procedures – Thermon ZE-B Beacon Terminator User Manual

Page 2

background image

Kit Contents . . .

Tools Required . . .

Receiving, Storing and Handling . . .

1. Inspect materials for damage incurred during shipping.

2. Report damages to the carrier for settlement.

3. Identify parts against the packing list to ensure the proper

type and quantity has been received.

4. Store in a dry location.

Dimensions . . .

Terminator

TM

ZE-B Beacon

INSTALLATION PROCEDURES

Item

Quantity

Description

1

1

Expediter Assembly
Grommet Compressor
Grommet
Support Base with O-Ring

2

1

Light Module Cover

3

1

Banding Guide

4

1

Banding

5

1

LED Light Module

1

2

4

3

Order Separately . . .

SCTK Connection Termination Kits (per cable)

SCTK-1

for BSX, RSX, VSX

SCTK-2

for KSX, HTSX

SCTK-3

for FP, HPT

5

210mm

(8.28")

75mm

(3.0")

89mm

(3.5")

66mm

(2.6")

Item

Quantity

Description

1

3

Splice Connection Boots

2

2

Small Crimps

3

1

Large Crimp

4

2

Small Crimp Insulators

5

2

Silicone Caps

6

3

Ground Sleeves (not used with ZE-B Kits)

7

1

RTV Tube

8

1

GRW-G (FP and HPT only)

2

4

3

5

6

1

7

Note:

Crimp Tool - Ideal 30-429 or factory approved alternate.

IP66 -60°C ≤ Ta ≤ +45°C
Ordinary & Hazardous Locations

IECEx FMG 10.0022X Ex eb mb IIC T6, Ex tb IIIC T85°C

1725 II 2 GD Ex eb mb IIC T6, Ex tb IIIC T85°C, FM 10ATEX0058X

Certifi cations/Approvals . . .

8

Installation Precautions . . .

• To minimize the potential for arcing and fi re caused by product

damage or improper installation use ground-fault protec-
tion.

• Installation must comply with Thermon requirements and be

installed in accordance with the applicable national and local
codes.

• Component approvals and performance ratings are based on

the use of Thermon specifi ed parts only.

• De-energize all power sources before opening enclosure.

• Avoid electrostatic charge. Clean only with a damp cloth.

• Keep ends of heating cable and kit components dry before

and during installation.

• Individuals installing these products are responsible for

complying with all applicable safety and health guidelines.
Proper personal protective equipment, or PPE, should be
utilized during installation. Contact Thermon if you have
any additional questions.