Step 2:
Matrix Removal for BSX, RSX, HTSX, KSX, and VSX Cables
2a.
Cut and remove primary insulation jacket (BSX
and RSX cables only).
Step 1:
Remove Heating Cable Overjacket and Separate Metallic Braid to Form Pigtail
1b.
Separate braid strands at edge of overjacket
and pull cable through opening in braid.
1c.
Twist braid into a pigtail. Trim ends of braid
and apply ground sleeve.
1a.
Cut and remove heating cable overjacket.
Do not cut metallic braid.
Terminator:
Route cable through base entry and
mount expediter to pipe using pipe band. Do not
band over cable.
Note:
For HPT and FP cable exchange grommet in
Terminator with GRW-G provided in SCTK-3.
IMPORTANT!
Heating cable must be properly
installed within expediter
assembly and mounted to pipe
prior to
terminating with SCTK kit.
See Terminator Installation
Instructions for expediter
mounting details.
76 mm
(3")
51 mm
(2")
2
SCTK
INSTALLATION PROCEDURES
2b.
Cut a 4mm strip of conductive matrix
between the conductors.
Do not cut bus wire strands.
2c.
Cut and remove the 4mm matrix strip.
4 mm
(.15”)
4 mm
(.15”)