Sctk, Installation procedures, Splice connection termination kits (per cable) – Thermon SCTK User Manual
Page 2: Receiving, storing and handling, Kit contents . . . tools required, Warnings
Splice Connection Termination Kits (per cable)
SCTK-1
for BSX, RSX, VSX
SCTK-2
for KSX, HTSX
SCTK-3
for HPT, FP
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the proper
type and quantity has been received.
4. Store in a dry location.
Item
Quantity
Description
1
2
Splice Connection Boots
2
2
Small Crimps
3
1
Large Crimp
4
2
Small Crimp Insulators
5
2
Silicone Caps
6
3
Ground Sleeves (not used with ZE-B Kits)
7
1
RTV Tube
8
1
GRW-G (FP and HPT only)
2
4
3
5
6
1
7
Kit Contents . . .
Tools Required . . .
1
8
Note:
1. These sets have been evaluated as components of Thermon’s Approved connection kits,
such that the area use ratings depend on the rating of the connection kits.
SCTK
INSTALLATION PROCEDURES
FMG 10.0022X Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C
1725 II 2 GD Ex eb IIC T4-T6, Ex tb IIIC T135°C-T85°C, FM 10ATEX0058X
Warnings
. . .
• Due to the risk of electrical shock, arcing and fi re caused
by product damage or improper usage, installation or
maintenance, a ground-fault protection device is required.
• Installation must comply with Thermon requirements
(including form PN 50207U for Ex systems) and be installed
in accordance with the regulations as per the norm EN IEC
60079-14 for hazardous areas (where applicable), or any
other applicable national and local codes.
• Component approvals and performance ratings are based
on the use of Thermon specifi ed parts only.
• De-energize all power sources before opening enclosure.
• Keep ends of heating cable and kit components dry before
and during installation.
• Minimum bending radius of heating cable is 32 mm (except
HPT is 57 mm and FP is 19 mm).
• Individuals installing these products are responsible for
complying with all applicable safety and health guidelines.
Proper Personal Protective Equipment (PPE) should be
utilized during installation. Contact Thermon if you have any
additional questions.
SCTK Certifi cations/Approvals
1
. . .