315 light kit wiring parts list, Wiring installation – Smithco Super Star 42-00x (sn 4841 – 4984/12712 – 12799) Parts & Service Manual User Manual
Page 67

65
Accessories
42-315 LIGHT KIT WIRING PARTS LIST
REF#
PART#
DESCRIPTION
QUANTITY
1
8875
Bullet Terminal
4
8963
Heat Shrink
1
/
4
"
4
2
42-319
Wire Harness
1
HLC-58
Loom Clamp
5
/
8
"
2
3
12-003
Toggle Switch
1
15-472
Switch Boot
1
WIRING INSTALLATION
1. Remove nut from left hand seat studs and place two loom clamps (HLC-58) onto seat stud. Hold in place
with the nut.
2. Drill a
1
/
2
" hole in fiberglass control panel 1" from 2WD/3WD toggle switch. (NOTE: Use 2WD/3WD hole if
not being used).
3. Hook red wire from the wire harness to toggle switch. Place toggle switch (Ref 3) into hole. Install switch
boot.
4. Run wire harness (Ref 2) to the front light. Snip the factory installed ends on headlight wires and install the
heat shrink and the bullet terminal (Ref 1) provided. Plug in wire harness to front head light. Do the same
to the rear light.
5. Run the red wire to the silver post of the circuit breaker and the black to the ground battery wire on the
engine.
6. Hook wire harness up in the loom clamps installed earlier.
7. Rotate front wheel to stop. Check for wire routing and interference. Place warning decal on lights.
8. Test headlights before putting machine into service.
Do not touch lights. Very Hot.
- Super Star 42-00x (sn 4765 – 4840/12663 – 12711) Parts & Service Manual Super Star 42-00x (sn 4661 – 4691/12628 – 12655) Parts & Service Manual Super Star 42-00x (sn 4692 – 4764/12656 – 12663) Parts & Service Manual Super Star 42-00x (sn 4985 – 5260/12800 – 12969) Parts & Service Manual Super Star 42-00x (sn 5261 – 5340/12970 – 13039) Parts & Service Manual