Ntake, Enting, Ilns – Skutt EnviroVent 2 User Manual
Page 9

9
9
C
usTom
I
nsTallaTIons
d
ual
i
ntakE
k
it
A Dual Intake Kit is required when you are venting 2 kilns with one Envirovent 2 or a single kiln that
is greater than 12 cubic feet in volume.
Dual Intake Kit Contents
A Dual Intake Kit contains : an additional Spring Loaded Plenum Cup Assembly, 4 - Hose Clamps, 1- 3” Y Duct
Connector and 2 - 8’ x 3” Flexible Aluminum Duct Sections.
3" Dia
Tube
Flex
Clamps
Radiator
Y-Duct
Connector
Envirovent 2
2-Kiln Installation
Cup
Aluminum
Cup Stand
With Spring
Radiator
Clamp
Cup
Aluminum
Cup Stand
With Spring
Radiator
Clamp
Flex
Tube
3" Dia
Installation for Two Kilns
Follow the instructions for installing the EnviroVent 2. The only difference will be that the 3” ducting from the
Plenum Cup Assemblies of the two units will attach to a Y-Duct connector and then up to the motor. Try and
keep the duct length between the plenum cup and the y-duct connector the same length for each kiln to ensure
equal air draw. See above diagram.
v
Enting
2 k
ilnS