REMKO HTL 400
NOTE
As standard, the devices are
equipped with a an automatic
rotation direction monitor for
the fan motor.
CAUTION
Cable extensions must
be suitable and may only
be used if they are completely
unrolled or rolled up..
NOTE
The electrical connection of
the device must be performed
at a dedicated supply point
with an earth-leakage circuit
breaker in compliance with
VDE 0100 section 55.
�������
�
�������� ����������
�����
�������� ���
�����
�������� �������
�����
�������� �������
�������� ����������
����������������
���������������
�������
������������
���������������
���������������
�
�
�
�
�
������
������
������
����������������� �� �� ������ �
����������������� �� �� ������ �
������
����������������� �� �� ������ �
����������������� �� �� ������ �
2
1
3. Open all closures in the fuel
supply. During initial
commissioning, air in the
supply lines can lead to a fault
shutdown of the
burner.
2. Each phase can be checked for
correctness using the phase test
selector switch.
Ventilation
The equipment can be used for air
circulation or ventilation purposes.
1.
Turn the operating switch to
the required operation position
“1” (low ventilation stage) or
“2” (high ventilation stage).
In these switch positions, the inlet
fan will run in continuous mode.
In these operational modes,
neither thermostatic nor heating
operation are possible.
Starting the device
Operation and monitoring of the
machine must be assigned to a
person who has been adequate
training.
Open the locking door at the rear
of the device.
Check that the operating switch on
the switch cabinet is set to the
“0” position (off).
Connecting the devices to the
power supply
The 400V/3~N electrical connec-
tion is made using a supplied
32 A CEE appliance coupler.
1.
The device must be connected
to a correctly installed power
socket via a suitable extension
cable. 400V/3~N/50Hz
Commissioning
Control panel / switch cabinet
All components are protected from the elements and unauthorized
operation behind the locking door above the fan.
Heating without room
thermostat
The device works in continuous
operation.
1. Connect the jumper plug 2
supplied to the thermostat
socket 1 on the device / switch
cabinet.
2. Turn the operating switch to
the required operation position
“1” (low heating stage) or
“2” (high heating stage) .