Osburn OB01801 User Manual
Page 29
/29
4.4 Baffle Installation and Brick Notes:
1.
Stack the baffle boards (A) on top of the vermiculite boards (B) as shown in figure 4.4a .
Figure 4.4a
2.
Put them on the horizontal air duct (C) (see figure 4.4b). Afterwards, push them towards the bottom
and sides so that they rest on the back of the firebox (D) and on the side air ducts.
Figure 4.4b