beautypg.com

Nortec HP Series User Manual

Page 40

background image

37 | HP Series Installation Manual

HP HVAC High Pressure Atomizing Humidifiers Start-up Checklist

Humidifier Serial Number: ___________________________________________________

Tag / Zones Served:

___________________________________________________

Pump Model: ________________________

Pump Voltage: ____________________

System Configuration:

 On/Off

 3-Stage

 6-Stage

 High-Resolution

Pump Inspection

RO or DI water supply connected

RO or DI water pressure between 20 and 60 psig (do not exceed 60psig)

Check valve installed on pump outlet (Danfoss PAH pumps only)

Drain line connected to pump

Supply voltage matches pump specification label

Valve Controller Inspection

120 VAC supply voltage connected

0-10V control signal connected to terminals 3 and 4

On/Off safety devices (or jumper) connected to 1 and 2

Valve Block Inspection

Valve coils wired to valve controller

High pressure supply connected and tight

Drain line connected

High pressure supply lines flushed

Manifold supply lines connected

Manifold Inspection

Air-handler drains are connected and open

Nozzle manifolds are securely mounted

Mist eliminator installed (if applicable)

Certification

Water piping is free of leaks

Pump is installed and operating normally

Manifolds and valves installed and operating normally

Installed by: ___________________________________________________________________

(Company Name and Business Address)

Inspected by: ___________________________________________________________________

(Company Name and Business Address)

Signed:

____________________________

Date: _______________________