Nortec HP Series User Manual
Page 40
37 | HP Series Installation Manual
HP HVAC High Pressure Atomizing Humidifiers Start-up Checklist
Humidifier Serial Number: ___________________________________________________
Tag / Zones Served:
___________________________________________________
Pump Model: ________________________
Pump Voltage: ____________________
System Configuration:
On/Off
3-Stage
6-Stage
High-Resolution
Pump Inspection
RO or DI water supply connected
RO or DI water pressure between 20 and 60 psig (do not exceed 60psig)
Check valve installed on pump outlet (Danfoss PAH pumps only)
Drain line connected to pump
Supply voltage matches pump specification label
Valve Controller Inspection
120 VAC supply voltage connected
0-10V control signal connected to terminals 3 and 4
On/Off safety devices (or jumper) connected to 1 and 2
Valve Block Inspection
Valve coils wired to valve controller
High pressure supply connected and tight
Drain line connected
High pressure supply lines flushed
Manifold supply lines connected
Manifold Inspection
Air-handler drains are connected and open
Nozzle manifolds are securely mounted
Mist eliminator installed (if applicable)
Certification
Water piping is free of leaks
Pump is installed and operating normally
Manifolds and valves installed and operating normally
Installed by: ___________________________________________________________________
(Company Name and Business Address)
Inspected by: ___________________________________________________________________
(Company Name and Business Address)
Signed:
____________________________
Date: _______________________