Nortec HP Series User Manual
Page 18
15 | HP Series Installation Manual
Secure the mounting rails to the gussets using the supplied fasteners. (1 – 3 fasteners per
gusset).
Figure 7: Mounting Rail Installation
Install the manifolds onto the mounting rails using the previously installed mounting rail clamps.
The manifolds should be equally spaced in the duct. There should be at least 6” from the top
of the duct to the mounting rails. Mounting rails should be installed on the upstream side of the
manifolds.
Figure 8: Rail and Clamp
See also other documents in the category Nortec Equipment:
- HumDigital (28 pages)
- NHDI Nortec OnLine (16 pages)
- SynPur (37 pages)
- Steam Distribution (15 pages)
- DRAABE Pure Water System (59 pages)
- AIRFOG Series (48 pages)
- NHDI Resistive Element (40 pages)
- LiveSteam v.1 (38 pages)
- OnLine NHRS (24 pages)
- SAM-e (62 pages)
- LINKS 2 SETC (50 pages)
- Outdoor Temperature Sensor (2 pages)
- Off Digital Wall Humidistat (4 pages)
- LINKS 2 SC (44 pages)
- Off Digital Duct Humidistat (4 pages)
- BLOWER PACK For RH Series (6 pages)
- Outdoor Mount Temperature Sensor (2 pages)
- SETC Outdoor (32 pages)
- Off Digital Wall & Duct Humidistat (6 pages)
- 2-10 V Wall & Duct Humidity Sensor (6 pages)
- Steam Distributors (16 pages)
- SE Series (100 pages)
- MES2 (54 pages)
- LINKS XPS SETC (68 pages)
- LINKS 2 GSTC B+ (23 pages)
- Modbus (52 pages)
- RH2+ (62 pages)
- Blower Packs (31 pages)
- LONWORKS (36 pages)
- Remote Interface (34 pages)
- NH-EL Series (99 pages)
- ME Direct Feed (40 pages)
- ME Control (76 pages)
- MLP RO pump station (12 pages)
- ME Control Installation (48 pages)
- Air Humidification System BS (30 pages)
- ME Direct Feed Installation (48 pages)