Nortec Steam Distribution User Manual
Page 11
Steam Line Distribution Installation Manual | 8
Figure 5: Vertical Airflow
WARNING
These installation guidelines apply for duct velocities under 2000 ft/min (610 m/min), please
consult factory for higher velocities.
Please make sure no obstacles (elbow, filter, or diffuser) are located after the distributor in the
direction of the airflow closer than the absorption distance calculated for your application.
Unless you know the exact absorption distance required for the steam absorption into the air
steam, the distributor should be located at least 8-10 ft (2-3 m) away from any obstacle it may
condense on (elbow, diffuser, filter, etc.).
See also other documents in the category Nortec Equipment:
- HumDigital (28 pages)
- NHDI Nortec OnLine (16 pages)
- SynPur (37 pages)
- DRAABE Pure Water System (59 pages)
- AIRFOG Series (48 pages)
- NHDI Resistive Element (40 pages)
- LiveSteam v.1 (38 pages)
- OnLine NHRS (24 pages)
- SAM-e (62 pages)
- HP Series (76 pages)
- LINKS 2 SETC (50 pages)
- Outdoor Temperature Sensor (2 pages)
- Off Digital Wall Humidistat (4 pages)
- LINKS 2 SC (44 pages)
- Off Digital Duct Humidistat (4 pages)
- BLOWER PACK For RH Series (6 pages)
- Outdoor Mount Temperature Sensor (2 pages)
- SETC Outdoor (32 pages)
- Off Digital Wall & Duct Humidistat (6 pages)
- 2-10 V Wall & Duct Humidity Sensor (6 pages)
- Steam Distributors (16 pages)
- SE Series (100 pages)
- MES2 (54 pages)
- LINKS XPS SETC (68 pages)
- LINKS 2 GSTC B+ (23 pages)
- Modbus (52 pages)
- RH2+ (62 pages)
- Blower Packs (31 pages)
- LONWORKS (36 pages)
- Remote Interface (34 pages)
- NH-EL Series (99 pages)
- ME Direct Feed (40 pages)
- ME Control (76 pages)
- MLP RO pump station (12 pages)
- ME Control Installation (48 pages)
- Air Humidification System BS (30 pages)
- ME Direct Feed Installation (48 pages)