Nevion 3GHD256256L User Manual
Page 9

3GHD256256L / SD256256L Rev. E
nevion.com | 9
Sync 1 and 2:
Synchronization signal 1 and 2 (in/out). Black&Burst/composite/tri-
level sync reference input with passive loop-through for vertical
interval switching.
Vertical Interval Switching Point: Manual configuration with options
fully in accordance with SMPTE RP168.
Power Alarm:
Power fail alarm relay contacts. Separate contact pair for each PSU
module that is installed. Contact closes on power failure. See Chapter
3.3.4 for further description.
SW 1:
Configurations switch 1. For address set of Multicon Gyda controlling
the Flashlink section. Switch 1-
3 shall be in “on” position (up), the
others shall be in “off” position. See also description in Chapter 3.7.
SW 2:
Configurations switch 2 (not in use).