Installation steps – Microsens MS655102/12x User Manual
Page 19

17
Installation Steps
1. Unpack the Industrial switch packing.
2. Check whether the DIN-Rail clip is screwed on the Industrial switch. If not,
screwed the clip on the Industrial switch. Please refer to DIN-Rail
Mounting section for DIN-Rail installation. If you want to wall-mount the
Industrial switch, then please refer to Wall-Mount Plate Mounting section
for wall-mount plate installation.
3. To hang the Industrial switch on the DIN-Rail track or wall, please refer to
the Mounting Installation chapter.
4. Power on the Industrial switch. Please refer to the Wiring the Power
Inputs section on how to wire the power. The power LED on the Industrial
switch will light up. Please refer to the LED Indicators section for
meaning of LED lights.
5. Prepare the twisted-pair, straight through Category 5 cable for Ethernet
connection.
6. Insert one side of Category 5 cables into the Industrial switch Ethernet
port (RJ-45 port) and another side to the network devices
’ Ethernet port
(RJ-45 port), ex: switch, PC or Server. The UTP port (RJ-45) LED on the
Industrial switch will light up when the cable connected with the network
device. Please refer to the LED Indicators section for LED light meaning.
7. When all connections are all set and LED lights all show in normal, the
installation is complete.