beautypg.com

Metro Unit-to-Unit Filler Kit User Manual

Workcenters, Installation instructions

background image

Part No. INST-UUTRIM

Date: 10/09/01

Unit-to-Unit Filler Kit

1. Measure the height of the gap between units to

be filled.

2. Cut filler strip to the appropriate size.
3. Remove paper backer from the back face of

adhesive strip.

4. Working from the top down, press filler firmly into

place between units.

5. Trim excess as required & repeat step #4.

Note: To assure proper adhesion, make sure
surfaces are clean prior to installation.

WORKCENTERS

INSTALLATION

INSTRUCTIONS