Installation manual masterline ultimate hybrid – HUBER+SUHNER MASTERLINE Ultimate Hybrid User Manual
Page 3

HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of
tools and accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product
warranty provided by HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these pro-
ducts. For advice concerning the general handling of these products please contact HUBER+SUHNER.
Step 9
Comment: All connectors (fiber optic and power) are protected with
water proof (IP67) dust caps. Therefore the MLU hybrid can be
installed and left at the mast for later installation of jumpers.
Step 10
Connect power jumper on left side of connector head by aligning
keyways and secure using integral retaining nut
(3 RRH shown connected in picture).
Step 11
Connect FO jumper on right side of connector head by aligning
keyways and secure by pushing to latch mechanism (3 RRH shown
connected in picture).
Step 12
If required a protactive cover can be easily fitted over MLUH
connector head.
Step 13
Ensure smooth routing of all cables form connector head to RRH
equipment using suitable cable clamps not cable ties.
INSTALLATION MANUAL
MASTERLINE Ultimate Hybrid