Groth waste gas burner onsite inspection checklist, Inspection point √ comments – Groth 8391B User Manual
Page 10
9
Groth Waste Gas Burner Onsite Inspection Checklist
Model No.:
Serial No.:
Factory Thermocouple Set Point:
Factory Timer Settings:
Factory Pilot Fuel Pressure:
Factory Pressure Switch Setting:
Inspection Point
√
Comments
Panel lights
Internal components in place
Auto mode functional test
Manual mode functional test
Thermocouple temperature operation
Temperature switch point
Time delay settings
Panel heater temperature
Audible alarm function
Pilot fuel pressure
Gage function
Solenoid valve function
Pilot flame quality
Main flame quality
Customer wiring to specification
Pressure Switch Set Point Verified
Burner condition [heat, corrosion,
contamination]
General Installation Notes:
Groth Associate:
Authorized Contractor Representative:
Date:
Date: