The rigging system – Grip Factory Munich GF-Multi Jib User Manual
Page 7

GF-Multi Jib Instruction Manual
Page: 6
Securing the parallelogram rod
Levelling the angle adjuster
To assist the set-up procedure and to reduce the risk of accidents it is recommended to
use set-up support stands or rostrums to support the crane arm during set-up and
breakdown.
The rigging system
To enhance the rigidity and reduce the strain to the GF-Multi Jib arm, a rigging system
consisting of various rods and a V shaped harness is required. The rigging system must
be used for all versions.
The length of the rigging depends on the number of extensions to be used. As a rule, the
rigging runs from the rigging harness mounted on the pivot section to the last section at
the front or end of the crane. Detailed drawings can be found in the following pages.
General instructions for assembling the rigging:
1. After connecting the turnbuckles to the rigging harness, connect the required rigging
rod and secure the rods with the provided safety pin.
2. Depending on the version, attach the required number of rods and secure them with
the provided safety pins.
3. When the rods are connected together and secured with the respective safety pins,
connect the front rods to the connections for rigging rods on the respective section.
Connecting the rigging rods
Rigging rod connector
Connection for rigging rod
Attention: for certain versions it is necessary to use a rigging rod connector between
the rods.