Grip Factory Munich GF-Multi Jib User Manual
Page 12

GF-Multi Jib Instruction Manual
Page: 11
Deloading:
Attention: The counterweights must always be gradually removed from the
counterweight bucket before removing the camera or remote head. Extreme caution
must be given to the shifting payload at all times. When dismantling the jib it is
essential that the whole arm is supported fully by a stable underlay i.e. rostrum or
ground surface. In any case the remote bracket should not be in the air without
support.
Attention: all necessary precautions should be taken so that unauthorized third
parties cannot use the jib.
General Safety
Operational conditions:
At a wind speed of 35km/h 22mph crane operation must be stopped and the crane
secured, dismounted and the necessary safety precautions taken.
If, for example, it takes 2 mins. to unload the counterweights and take the necessary
precautions to secure the crane, one must commence with the procedure at a wind speed
of 30km/h / 19mph. DIN15019, part 1, section 6.13.
The crane may not be used in a lightning storm as there is the danger of electrocution.
Notice:
When operating the crane with the push bar mounted on the dolly, pay attention that the
crane arm at no time collides with the push bar.