beautypg.com

Step 5 install supply unit, Step 6 attach ductwork to unit discharge, Duct size/location and intake dimensions – Greenheck KSF (457646) User Manual

Page 3

background image

3

Lifting Lugs

(4 places)

step 5 install supply Unit

Use a crane hooked to the factory lifting lugs (as shown in the diagram) to lift and center the unit on the curb. For
larger units with 7½ to 10 horsepower motors, it is recommended to use a spreader bar to support the unit while
lifting.
Use self-tapping sheet metal screws to fasten unit to the curb through the holes provided.
Electrical connections can be made at this time.

Complete installation
Illustration shows the complete installation of a
downblast unit. If the unit is horizontal discharge,
proceed to Step 6.

step 6 attach Ductwork to Unit Discharge

For horizontal discharge units: The chart and drawing show opening size and location for the 2 inch discharge
collar. Also included is the recommended straight duct lengths for optimal performance. Greenheck recommends
attaching ductwork to collar using a rubber duct section at the unit to eliminate vibration.

Discharge Collar

Dimensions

Intake Opening

Dimensions

D

C

A

B

E

F

Curb
Height

Curb
Height

Duct size/Location and intake Dimensions:

Housing

Size

Blower

Size

A

B

C

D

E

F

Straight

Duct

Length*

1

108

9

13

8

1

2

13

26

27

37

109

9

13

8

1

2

13

26

27

37

110

9

3

4

14

8

14

26

27

47

2

112

10

1

2

16

12

16

36

33

54

115

12

7

8

20

10

20

36

33

68

3

118

15

1

4

24

14

24

48

43

81

120

14

1

4

26

13

26

48

43

96

*AMCA recommended minimum straight duct lengths for
optimum performance.
All dimensions are shown in inches.